Research Projects

Ongoing Research Projects

Timespan: 10/01/2024 – 09/30/2028

Subprojects

  • TP7: “Analysis of the Multiaxial Stress State during Crack Initiation Using the Phase Field Method”

Timespan of the 1st funding period: 07/01/2024 – 12/31/2027

Subprojects

  • A02: “Modeling of Local Failure Mechanisms and Macroscopic Strength Properties of HyPo-Materials”

Timespan: 12 months

Subprojects

  • TP: “solidFIDEMO – a firn densification model for volumetric mass balances”

Further information

Timespan: 36 months

Timespan: 36 months

Timespan: 24 months

Completed Research Projects

Timespan of the 1st funding period: 07/01/2011 – 06/30/2015
Timespan of the 2nd funding period: 07/01/2015 – 06/30/2019
Timespan of the 3rd funding period: 07/01/2019 – 06/30/2023

Subprojects

  • A01 “Modeling and Simulation of Wetting of Component Surfaces” (2nd/3rd funding period)
  • A04: “Multiscale Modeling and Simulation of Microcutting of Titanium Materials” (1st/2nd funding period)
  • A05: “Phase Field Modelling of Transformation and Failure Mechanisms in the Vicinity of Surfaces” (1st/2nd/3rd funding period)
  • B02: “Systematic Temperature Control when Turning Metastable Austenitic Steels” (1st/2nd funding period)

Further information

Timespan of the 1st funding period: 07/01/2014 – 12/31/2018
Timespan of the 2nd funding period: 01/01/2019 – 06/30/2023

Subprojects

  • UKL 3.1: “Simulation of cutting processes using the particle finite element method” (1st funding period)
  • UKL 4.2: “Computational homogenization techniques coupling multiple scales” (1st funding period)
  • UKL 3.1: “A particle FEM for the simulation of cutting processes and additive manufacturing” (2nd funding period)
  • UKL 3.2: “Phase field simulation for fatigue failure prediction in processing” (2nd funding period)

Further information

Timespan: 2015 – 2021

Subprojects

  • “Advanced Finite Element Modelling of 3D Crack Propagation by a Phase Field Approach”

Further information

Timespan: 2012 – 2018

Subprojects

  • P4: “Investigation of size effects in ferroelectric materials by use of phase field simulations”

Further information

Timespan: 36 months

Further information

Timespan: 2017 – 2020

Subprojects

  • TP3: “Dynamic of the grounding line at the 79°N Glacier”

Further information

Timespan: 2017 – 2020

Further information

Direction: 2013 – 2018

Further information

Collaboration Projects

  • Fraunhofer-ITWM
  • Bosch
  • GSI